Skip to content
Burner.wikiKNOWLEDGE HUB
DungsGas Leak Detectors

Dungs VPM-VC Burner Accessory

Technical specifications and related model references.

Product Overview

The DUNGS VPM-VC is an advanced Valve Proving System (VPS) designed to verify the integrity of safety shut-off valves prior to burner ignition or after shutdown. By precisely monitoring the pressure dynamics between two solenoid valves, it detects micro-leaks that could lead to catastrophic fuel accumulation in the combustion chamber. Operating independently of system pressure variations, it provides a definitive fail-safe diagnostic, fulfilling the stringent requirements of EN 1643 for large-capacity industrial burners.

Recorded catalog values are provided for comparison. Verify the complete model suffix and document revision before use.

Catalog Specifications

Function

Automatic Valve Leakage Testing

Test Volume

Up to 50 Liters

Test Duration

10 to 26 seconds (Model dependent)

Operating Voltage

230 V AC / 115 V AC / 24 V DC

Approvals

CE (EN 1643), FM, UL

Selection Notes & Data Verification

The VPM-VC page is structured for engineering comparison: confirm the product type, firing range, fuel type, operating mode, electrical supply, and safety approvals against the manufacturer datasheet before specifying the burner or component.

Burner.wiki normalizes product data for discovery and comparison, but final selection should account for combustion chamber backpressure, local emission limits, control sequence requirements, and site commissioning conditions.

Application Checks

Equipment and fuel compatibility
Control sequence and interfaces
Operating envelope
Installation documentation

Related Models

Related Knowledge

FAQ

What is Dungs VPM-VC used for?

Dungs VPM-VC is referenced as a burner accessory for industrial combustion systems. Verify the exact application against the burner documentation, control cabinet wiring, and manufacturer datasheet.

Can VPM-VC replace another model?

Replacement depends on voltage, safety timing, wiring terminals, flame supervision method, mechanical fit, and local combustion safety requirements.

What should be checked before installing VPM-VC?

Check supply voltage, burner sequence, fuel type, pressure or capacity range, detector compatibility, safety loop configuration, and the equipment nameplate before commissioning.

Documentation Note

Technical documentation should be verified against the manufacturer datasheet, burner cabinet wiring diagram, and equipment nameplate before installation or replacement.

Before replacement
  • Check supply voltage and frequency.
  • Confirm terminal layout and safety interlocks.
  • Verify flame detector or actuator compatibility.

Plan Your Selection

Use the selection guide to organize model, operating condition, and documentation checks.

Selection Guide